Fitout update - praise God for His provision
Praise God for the way he has provided through the generosity of you, His people.
Because of what you’ve all contributed, we in the Project Team have been able to make a really good plan of how to steward the funds and maximise their use to get our new building ready for ministry.
Just a note, this is the current plan, but if prices are higher or lower than expected, or if extra funds come in, things may change.
What we have funds allocated for:
Funds to move our gear and furniture from Berwick St to the new building and get it installed
AV & IT services
Systems that will support the offices and network requirements to run the AV system
A functional audiovisual system in the Auditorium. The AV system will have some compromises to the projection and speakers that can be retrofitted later.
A hearing assist system.
Basic kitchen fitout. We’ll largely be reusing items from Berwick St, supplemented with additional storage racks and a few new appliances.
Cleaning items such as soap and towel dispensers, air fresheners, battery vacuum cleaners, cleaning trolley
Furniture
Reusing all 186 church chairs from Berwick St, with 214 additional new chairs purchased to reach a total count of 400 chairs in the Auditorium
Supplemented by additional chairs for other meeting areas
Minimal other soft furniture for cry room, youth lounge, foyer
Reusing office furniture from Berwick St to fit out the new offices, with a few new chairs that are required.
New boardroom and small meeting room tables for staff meetings (the large boardroom style table has already been purchased for the bargain price of $102 against a budget of $3025!)
Land Development
Funds for engineering input and resource consent for the additional carparks outside the main contract
New fence for the boundary with the neighbours which is in bad condition and in the wrong place
Landscaping and fencing an under-five children’s play area, adult mingling areas, and youth area including a gaga pit
Basic planting through the garden beds
Signage for the entrances and wayfinding in and around the building
What we don’t currently have funding for:
Café tables and chairs for foyer socialising
Sufficient chairs for all meeting areas. We’ll need to move furniture around the building for events as needed
Enough soft furniture such as couches for the Foyer and the Youth Lounge
Full AV/IT capability in the Hall and all meeting rooms. Not all rooms will have the intended AV systems, and we’ll need to rely on moving portable projectors, etc.
All the appliances to fully kit out the kitchen. We’ll be missing additional fridge and freezer space, bratt pan, griddle, and kitchen island
Dishwashers and mini fridges for the youth, foyer, and kid’s area kitchenettes
Fully landscaped social areas outside
Fully developed carpark areas
A large sign on the exterior west wall of the auditorium, visible from the motorway.
Praise God for what he has supplied! Our plans suggest that we’ll have what we need to move into the building and start using it for church services, midweek ministry and most events. Over the coming months and years, as funding becomes available, we will be able to finish fitting out the building.
- Joshua Cornish (7 pm service)
Fitout and Land Development Project Manager