We are so thankful that the Rosebank site is being well used as we progress the design and prepare to undertake construction of Latimer’s new home. We are currently nearing the end of the concept design phase, having received extensive congregation input, brought together a design team, and worked with ministry teams to develop a concept for the major parts of the project: Where the building sits on the site, the broad layout of spaces, and what these might look like both inside and outside.
The concept phase is critical to streamline the detailed design phase, and then construction. Over the next month we are resolving the concept drawings for review by the board and presentation to the congregation. We are also looking to provide a more detailed estimate of the project cost soon after, so that we can all consider what is presented, provide any further feedback, and more formally decide on progressing to the next stage. The construction industry has its challenges at this time, but we have been blessed in many ways with the project to date. Please continue to pray that the Lord will continue to guide and support us to serve His purpose through this new home for Latimer Church.
Geoff Banks (Project Director)